Back to products
Port & shipyard cranes

Harbour portal slewing crane

A portal-mounted slewing and luffing crane; the source includes MQ-series configurations.

Configuration
Specified for your project
Model / series
Model to be confirmed
01 / Details

Product overview

A portal-mounted slewing and luffing crane; the source includes MQ-series configurations.

Plan the crane around the vessel or yard, working radius, lifting arrangement and travel routes.

02 / Configuration

Technical overview

Model / series
Model to be confirmed
Product type
Harbour portal slewing crane

Share your required capacity, dimensions and working conditions so the configuration can be confirmed.

Harbour portal slewing crane

Technical introduction

Structure and operating principle

A portal-mounted slewing and luffing crane; the source includes MQ-series configurations.

A portal supports a slewing upper structure and a luffing boom. Lifting capacity depends on the actual radius and operating configuration, while the portal and travel gear transmit loads to the quay or foundation.

Application and selection

For port transfer using the approved hook, grab or other attachment for the supplied configuration. Quay capacity, vessel clearance and the load-radius chart must be part of the operating plan.

Working method

  1. Before work, authorised personnel confirm the load and its centre of gravity, the permitted machine configuration, the route and receiving position. Complete the checks specified for the equipment, verify protective functions by the approved method and stop if a defect affects safe operation.

  2. Select the correct load-chart configuration, align vertically over the load and verify attachment engagement. Coordinate hoisting, slewing and luffing within the permitted envelope, then land and release the load in a clear receiving zone.

  3. After the task, place the load on stable supports and leave the equipment in its prescribed safe state. Record faults and abnormal events. Maintenance or jam clearance requires secure isolation of relevant energy, including stored hydraulic, pneumatic and gravitational energy.

Precautions and maintenance

Do not treat a nominal maximum capacity as available at every radius. Prevent side loading and collision with ship structures, and follow the model-specific wind limits, travel restrictions and storm-securing procedure.

Inspection frequency, wear/discard criteria, lubrication, brake adjustment and replacement parts follow the supplied instructions and applicable local requirements. Only competent personnel may maintain the equipment; return to service follows the prescribed checks.

Configuration and standards

This is an equipment-selection and operating-principle overview, not a complete operator manual, lift plan or certificate. Verify rated load, duty, geometry, environment and protective functions against the nameplate, approved drawings and delivered instructions. Do not combine separate series maxima into one promised configuration.

Requirements follow the destination and installation, not the website language. China: determine the applicable GB/T references and statutory equipment obligations. EAEU destinations: check the applicable TR CU/EAEU regulations, amendments and conformity documents. English-speaking markets: select the relevant national rules; US OSHA and UK HSE references are not universal law. EU projects require their own applicable conformity assessment.

Technical references

References checked on 17 September 2026. Product-specific facts come from the retained supplier material. Standards links confirm official editions and scopes; full paid clauses have not been audited. Public regulator guidance and manufacturer technical material corroborate general workflows, not certification or specifications of this product.

HenanMine Crane / Plan your configuration

Build around your operation.

Tell us your load, workspace and operating requirements.

HenanMine Crane
Request a quote

Tell us about your lift.

Tell us what you need. Continue to WhatsApp with your product and project details, or send them to our sales email.

WhatsApp opens with your details filled in. The email option sends this form to our sales team.

Certificate

WhatsApp