Shipyard Crane and Boat Hoist Layout Planning
Define the load path, berth or slip geometry, clearances and ground support for a shipyard crane, boat hoist or harbour portal crane.

A fabricated hull block, a vessel supported by slings and a load transferred at a berth require different drawings. Start with the pickup and set-down conditions and show the path between them, including the surrounding structures, traffic and changes in travel level.
Hull blocks under a shipbuilding gantry
Provide the block envelope, verified mass and centre of gravity, approved lift points and set-down tolerances. Draw the rigging and crane swept envelope through the route. Include adjacent fabrication bays where the block or equipment might project into another work area. If the move includes a turn or coordinated hoists, submit the proposed load cases and sequence for a competent lift-planning review. HSE guidance on complex lifting operations
Vessel haul-out with a mobile boat hoist
Show vessel beam and draft, approved sling locations, protrusions and the allowable hull contact conditions. Include the slip clear opening, the approach surface and the route to the stands. Sling positioning may need to vary across the vessel fleet. Check strap clearance, the tyre path and its support, and the required vessel orientation jointly with the boat owner, yard and equipment supplier. Marine Travelift boat hoist and sling positioning
Harbour portal crane at a berth
Describe the load over the intended working radii and provide both waterside and landside coordinates. Give the supplier vessel profiles, nearby fixtures and the available travel envelope. Ask the civil team to review the applicable rail reactions. Define the marine exposure, parking position and operating conditions used for the structural and operating review.
Use the shipbuilding gantry crane, mobile boat hoist and harbour portal crane layouts as starting points. Send the vessel or block drawings and the proposed route for project review.