How to Specify an Overhead Crane for Your Building
Plan an overhead crane around runway span, hook coverage, lift height and wheel reactions. Use a survey and lift schedule to compare crane layouts.

An overhead crane can meet the rated load and still leave a work station out of reach. The missing dimension is often the hook approach, the space between the hook at its travel limit and a runway or end obstruction. Before requesting a quote, mark each required pickup and set-down point, then take the same drawing to the crane supplier and the engineer responsible for the building. That lets both teams review the usable lifting area and the loads on the supporting structure.
Measure the runway and hook approach
For a top-running layout, report the span between the runway rail centrelines. Give the runway length as a separate dimension and identify the available bridge travel. Provide measured rail elevations and identify where they change. Include the building grid, columns, roof bracing, lights, ducts and other equipment in the survey.
At each workstation, locate the point where the hook must land in three dimensions. Check it against the bridge end approach and the trolley side approach on the proposed general arrangement drawing. The resulting working rectangle can be smaller than the bay. The survey method and terminology used by Mazzella offer a useful reference for checking the original dimensions. Measuring span and runway length
Check lift height and headroom at the same station
Use one elevation datum for the survey and drawings. Mark the lowest pickup, the highest required hook position, the top of the load during the move and the lowest overhead obstruction. Record rigging height and a lifting beam if either is part of the task. Ask the supplier to show the reference points for hoist headroom and to identify the limiting hook positions.
For example, an assembly can clear a machine at its lowest pickup point and still fail to clear a raised fixture during transfer. Checking the hook, rigging and load at both stations exposes that conflict before the supplier selects the hoist or bridge arrangement.
Compare layouts with the same duty and reactions
Send a lift schedule with load weights, occasional maximums, lifts per shift and travel distances. Ask each supplier for dimensions and maximum wheel reactions for that duty and layout, together with the rail and power interfaces. The structural engineer needs those reactions to review runway beams, columns, connections and foundations. Apply the lifting rules relevant to the installation, including OSHA's overhead and gantry crane requirements where the US provision applies. US OSHA overhead and gantry crane standard
Compare a single-girder overhead crane, a winch double-girder crane and a coordinated crane and support structure using the same work points and duty. Share your bay survey and lift schedule to review the layout before the runway design is fixed.