Load Sharing on a Twin-Trolley Crane

With a twin-trolley crane, the combined load can be well below the sum of both hoist ratings while one hook carries more than intended. When the centre of gravity is nearer one lifting point, that point carries more of the weight. Start by drawing the load, its two pick positions and the centre-of-gravity range. The drawing gives the lifting team a way to identify which configurations require closer review before it approves a lift.

Use the centre of gravity to understand static load share

Consider a rigid item weighing 100 kN, held level and stationary by two vertical lines 4 m apart. Its centre of gravity lies 1.5 m from the left pick point. Taking moments about the left point gives a right reaction of 100 × 1.5 ÷ 4, or 37.5 kN. The left reaction is 62.5 kN because both reactions together support 100 kN.

That is an illustrative static calculation for the stated geometry. In a project review, include the hanging mass of each attachment in the appropriate load case, and use the actual positions and forces. A change in orientation, angled lines or a shifting centre of gravity changes the assumptions. The illustration does not establish any rated capacity or permissible crane operation.

Check the transfer between lifting positions

List the steps where the load leaves a support, changes orientation or reaches another support. Identify what each hook carries at every step. Small changes in hook elevation or stiffness can redistribute load in constrained setups. The engineering review should check the approved trolley and bridge loading conditions as well as each individual hook and attachment.

Specify how a coordinated move is to be commanded and supervised. Check whether the supplied equipment supports the necessary operating modes and how limits will be checked. When multiple cranes are used, a competent person needs to plan the operation appropriately for its complexity and applicable site requirements. HSE guidance on planning lifting operations

Prepare the inputs for the lift engineer

  • Provide the verified weight, centre-of-gravity envelope and lift-point geometry.
  • Record each orientation, transfer step, hook height and clearance requirement.
  • Identify the attachment and expected load on each crane, trolley or hoist for review against the approved configuration.

Bring the same load drawing to the review of an ME twin-trolley gantry crane or an MHHE twin-hoist truss gantry. Send your proposed lift cases so the lifting and equipment teams can review the interfaces.

All news
HenanMine Crane
Request a quote

Tell us about your lift.

Tell us what you need. Continue to WhatsApp with your product and project details, or send them to our sales email.

WhatsApp opens with your details filled in. The email option sends this form to our sales team.

Certificate

WhatsApp