How to Specify a Ladle Crane for Hot Metal
Specify a ladle crane around the loaded vessel, lifting and tilting interfaces, duty cycle, heat exposure and plant recovery requirements.

Start a hot-metal crane enquiry with a route drawing and a schedule of loaded vessels. Show where the crane picks up from a transfer car, passes near a furnace and sets down at the caster or other process station. The duty and heat exposure can change across these positions even for the same vessel. Konecranes steel industry equipment guide
Give the supplier the vessel and hook geometry
Record the maximum approved gross lifted mass, including the vessel, contents and relevant lifting accessories. Supply the trunnion dimensions and tolerances, the allowable hook positions and the clearance needed around the ladle beam. If an auxiliary hook tilts the vessel, identify its connection point and the required range of motion. Ask for a drawing of the complete lift and tilt envelope at each process station so the vessel, attachment and building can be reviewed together.
Describe duty and heat by work phase
List the starts, movements and loaded and unloaded cycles expected over the production schedule. Identify where the crane or attachment dwells near a heat source and provide the project's ambient and radiant heat information. This lets the equipment designer evaluate exposure at the hooks, ropes, brakes, electrical enclosures and operator position individually. Ask for the documented basis of the protective features and the inspection access needed to keep them serviceable.
Review the loaded recovery scenario
Define the plant response to a loss of power or a stopped motion when the ladle is suspended. Ask the supplier to document braking and recovery provisions and the site team to check the relevant requirements for hot-metal handling. Apply the same exercise to a coke pot transfer, using the actual pot engagement and discharge interfaces. For complex or high-risk lifts, plan the work and assign responsibilities with the competent site team. HSE lifting-operation guidance
For examples of different process layouts, see the QDY ladle crane, YZ casting crane, HY metallurgical hoist and coke pot crane. Share the vessel drawings and lift schedule when requesting an engineering review.