How to Select a Gantry Crane for Your Work Area
Compare full and semi-gantry crane layouts using hook reach, span, lift height and support reactions. Build a layout around real pickup points.

Choose a gantry crane around the route a load must take, from its pickup point to its receiving position. Start with a plan showing the set-down points, vehicle lanes and obstructions. Then decide which supports the site can accommodate. A full gantry can use two ground-level tracks. A semi-gantry connects an elevated runway on one side with a ground-level travelling leg on the other. Each layout changes the useful hook reach and the parts of the building or foundation that carry the crane.
Select the support layout before comparing capacity
A full gantry carries the bridge through its legs. Draw where the legs and travel wheels move throughout the working area. Include workshops, access gates, vehicle crossings and temporary storage. In a semi-gantry layout, survey both travel levels from a common datum. Provide details of the building steelwork at the high runway and the foundation under the low track.
Treat hook coverage as a separate decision from nominal span. For a load close to a leg, plot the workpiece and rigging outline at the actual pickup height. Check the side and end approaches against the equipment drawings. Where the project needs overhang access, ask the supplier to identify the permitted working area and configuration.
Turn the lift cycle into the crane specification
List the heaviest complete lift, including lifting attachments, and the range of more frequent loads. Give the vertical travel, horizontal travel and expected cycles. Include lift heights at set-down and any obstruction the load must cross. The duty and load positions help the supplier assess the trolley or hoist, the bridge, and the wheel reactions for the supporting design.
Ask for a general arrangement, the proposed hook envelope and wheel reaction data tied to load positions. On an outdoor site, include expected exposure and request the operating and parked arrangements for the project. Keep the local inspection and operating requirements with the selection documents. For US sites where it applies, OSHA defines overhead and gantry equipment and addresses clearances, inspection and use. US OSHA overhead and gantry crane standard
Check the layout against a real move
For a fabrication bay, pick a long component from the lift schedule. Draw it as it passes the leg and approaches the receiving fixture. Then check whether the crane can set it down while the intended vehicle lanes remain available. A proposed change in track position can affect both the usable work area and the supporting structure.
Review the MH single-girder hoist gantry, MHB semi-gantry hoist crane and MG trolley gantry against the same move. Send the work area plan and duty schedule for a configuration review.